Bid Number: PW 21-09
Bid Title: Frost Heave Repair - Witter Gulch Road
Category: Road and Bridge
Status: Closed

Description:

REQUEST FOR BIDS

CLEAR CREEK COUNTY ROAD & BRIDGE DEPARTMENT

CLEAR CREEK COUNTY, COLORADO

 

Clear Creek County (Owner) is requesting Bids for the construction of the following Project:

PW 21-09 Frost Heave Repair

Witter Gulch Road

Bids for the construction of the Project will be accepted electronically with the following exact text in the subject line: Bid for PW 21-09 Frost Heave Repair.  Bids sent by parcel service or U.S.P.S. shall be addressed to the attention of Stoy Streepey and be clearly marked on the front of the envelope with: Bid for PW 21-09 Frost Heave Repair.  

All bids must be received  via email to , via courier at the Clear Creek County Road & Bridge Department located at 3549 Stanley Road (CR 312), Dumont, Colorado 80436 or via U.S.P.S at P.O. Box 362, Dumont CO 80436 no later than Thursday, September 23, 2021 at 11:00AM local time. At said time all bids duly received will be publicly opened and read aloud via Zoom:

https://zoom.us/j/99069968272?pwd=eURaV1g2aW9QZFQ4bHlKKzRUZjNOdz09

 

The Project includes the following Work:

  • Frost heave repair

    • Includes the full width removal of approximately 170 feet of asphalt and replacement with an insulated asphalt road surface

  • Culvert replacement

    • Replacement of a 36-inch diameter by 40-foot long corrugated metal pipe and asphalt road surface patch

 

Obtaining the Bidding Documents

Information and Bidding Documents for the Project can be found at the following designated website:

https://co-clearcreekcounty2.civicplus.com/Bids.aspx?CatID=17

Bidding Documents may be downloaded from the designated website. The RFB documents for this project are at the bottom of this Bid Posting on the website listed above, under Related Documents.  The designated website will be updated periodically with addenda, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Owner will not be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.

Instructions to Bidders.

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Request for Bids that is included in the Bidding Documents.

This Advertisement is issued by:

Owner:     Clear Creek County

By:              Clear Creek County Road & Bridge Department

Title:          Stoy Streepey, PE, County Engineer

Date:         September 1, 2021

 

(Notice published on the County website www.clearcreekcounty.us September 1st - September 23rd, 2021)

Publication Date/Time:
9/1/2021 11:00 AM
Publication Information:
September 1 thru 23rd, 2021 - 11:00 pm when Bid Closes
Closing Date/Time:
9/23/2021 11:00 AM
Submittal Information:
Please see complete RFB for submittal information
Bid Opening Information:
Sept. 23, 2021 - 11:00 am
Contact Person:
REQUEST FOR BIDS
CLEAR CREEK COUNTY ROAD & BRIDGE DEPARTMENT
CLEAR CREEK COUNTY, COLORADO

Clear Creek County (Owner) is requesting Bids for the construction of the following Project:
PW 21-09 Frost Heave Repair
Witter Gulch Road
Bids for the construction of the Project will be accepted electronically with the following exact text in the subject line: Bid for PW 21-09 Frost Heave Repair. Bids sent by parcel service or U.S.P.S. shall be addressed to the attention of Stoy Streepey and be clearly marked on the front of the envelope with: Bid for PW 21-09 Frost Heave Repair.
All bids must be received via email to sstreepey@clearcreekcounty.us, via courier at the Clear Creek County Road & Bridge Department located at 3549 Stanley Road (CR 312), Dumont, Colorado 80436 or via U.S.P.S at P.O. Box 362, Dumont CO 80436 no later than Thursday, September 23, 2021 at 11:00AM local time. At said time all bids duly received will be publicly opened and read aloud via Zoom:
https://zoom.us/j/99069968272?pwd=eURaV1g2aW9QZFQ4bHlKKzRUZjNOdz09

The Project includes the following Work:
• Frost heave repair
• Includes the full width removal of approximately 170 feet of asphalt and replacement with an insulated asphalt road surface
• Culvert replacement
• Replacement of a 36-inch diameter by 40-foot long corrugated metal pipe and asphalt road surface patch

Obtaining the Bidding Documents
Information and Bidding Documents for the Project can be found at the following designated website:
https://co-clearcreekcounty2.civicplus.com/Bids.aspx?CatID=17
Bidding Documents may be downloaded from the designated website. The RFB documents for this project are at the bottom of this Bid Posting on the website listed above, under Related Documents. The designated website will be updated periodically with addenda, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Owner will not be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.
Instructions to Bidders.
For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Request for Bids that is included in the Bidding Documents.
This Advertisement is issued by:
Owner: Clear Creek County
By: Clear Creek County Road & Bridge Department
Title: Stoy Streepey, PE, County Engineer
Date: September 3, 2021

(Notice published on the County website www.clearcreekcounty.us September 1st - September 23rd, 2021)